Darling Foundry, , , , , " />

Project Blog
Events, press, parties, and works in-progress

Cargo: Sugar mural installation

Here is documentation of the short-lived life of my mural… It was installed on August 19, I had an opening for it on the 20th and by the 28th the panel was taken down. Normally, these installations last longer, but we suddenly got a lot of rain in a short amount of time. At the end, the wasps were becoming an “issue” of public safety (ie: the City of Montreal asked us to take it down!). But it was at the end of its life anyway, so we appeased them.

Photo documentation from this week-long process of degeneration is being used to create a single photo-montage that will replace the sugar mural. This billboard image will launched for the opening of the 2009 Mois de la photo in Montreal at the Darling Foundry on September 12.


Posted by admin on August 30th, 2009 :: Filed under Cargo (Montreal)
Tags :: , , , , ,

Installing sugar mural

Installing the mural on-site happened on August 18 and 19th, just before the opening on the 20th. It’s up!! It’s already started to fade, so we’ll see how long this one lasts.


Posted by admin on August 19th, 2009 :: Filed under Cargo (Montreal)
Tags :: , , , , ,

Plan Large – Darling Foundry and Mois de la photo

I am working on a 2-part project in Montreal for August/September 2009. It’s for the “Plan Large” project that the Darling Foundry does in conjunction with Mois de la photo. The Darling Foundry has 4 public billboards located in Old Montreal. For each Mois de la photo biennale, the Foundry selects 2 new artists for 2 of the billboards. With this scheme, each billboard stays for 4 years.

I was selected for the ground level billboard this year. The first part of the project is to install a newly designed sugar mural on top of the existing billboard space. As this is a temporary mural, I will be documenting it throughout its demise. This sugar mural will be installed in the beginning of August. Once I have completed my documentation, I will be composing a photo-montage from my documentation. Regardless of its appearance, the panel will the removed by the middle of September so that the photo can be installed in it’s place.

The opening for the Mois de la photo is September 12. At this time, I am still uncertain if the photo will be up for this date, or if the sugar mural will remain. The original idea was to leave the sugar mural up for the opening, so that people could see this ephemeral work before it’s gone. Since the photo billboard will be up for 4 years, there will be ample opportunity for people to see the photo at a later date. This is likely what will still happen.

Here are some images of my design at my studio. The pattern is printed out to the scale and shape of the actual mural (approx. 5 1/2 feet high x 12 feet wide).


Posted by admin on July 21st, 2009 :: Filed under Cargo (Montreal)
Tags :: , , , , , ,